Please use this identifier to cite or link to this item: https://elibrary.tucl.edu.np/handle/123456789/6938
Full metadata record
DC FieldValueLanguage
dc.contributor.authorSUBEDI, AMIT-
dc.date.accessioned2022-01-02T06:21:24Z-
dc.date.available2022-01-02T06:21:24Z-
dc.date.issued2021-03-
dc.identifier.citationMASTER IN ENERGY SYSTEM PLANNING AND MANAGEMENTen_US
dc.identifier.urihttps://elibrary.tucl.edu.np/handle/123456789/6938-
dc.descriptionGeographical difficulties and slow development of power generation, transmission and distribution, related activities have made many remote areas not assessable to national grids in Nepal.en_US
dc.description.abstractGeographical difficulties and slow development of power generation, transmission and distribution, related activities have made many remote areas not assessable to national grids in Nepal. Electricity demand is increasing day by day in urban as well as rural areas but instant extension of national grid seems difficult in many remote places of Nepal. Thousands of Micro hydropower are being installed throughout the country where extension of grid is difficult. This paper presents the introduction of battery bank for the supply side management in the micro hydropower plants. Surplus power during off load time is stored in a battery instead of wasting in dump load. The system is designed in Matlab Simulink where system containing Electronic Load Controller(ELC), Battery Management System(BMS), three phase ac/dc converter were used. Synchronous Generator which generates constant power feeds the load, battery and dump load according to requirement. Battery uses the power for charging during off load hour and supplies deficit power during peak hour. Case study of Pinthali microhydro power of capacity 8.1 KW was carried out for load survey to calculate excess power. Simulated system successfully distributed the power to the load when load demand was higher than generation through the battery.en_US
dc.language.isoenen_US
dc.publisherPulchowk Campusen_US
dc.subjectpower generation,en_US
dc.titleSupply Side Management in Micro Hydro using Battery Bank: A case study of Pinthali Microhydro plant, Kavre, Nepalen_US
dc.typeThesisen_US
local.institute.titleInstitute of Engineeringen_US
local.academic.levelMastersen_US
local.affiliatedinstitute.titlePulchowk Campusen_US
Appears in Collections:Mechanical and Aerospace Engineering

Files in This Item:
File Description SizeFormat 
AMIT SUBEDI.pdf3.67 MBAdobe PDFView/Open


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.