Please use this identifier to cite or link to this item: https://elibrary.tucl.edu.np/handle/123456789/18638
Full metadata record
DC FieldValueLanguage
dc.contributor.authorBhatt, Nabin-
dc.contributor.authorGautam, Saurab-
dc.contributor.authorBhandari, Shishir-
dc.contributor.authorChaudhary, Subash-
dc.contributor.authorKunwar, Subash-
dc.contributor.authorDahal, Vishan-
dc.date.accessioned2023-07-25T06:07:13Z-
dc.date.available2023-07-25T06:07:13Z-
dc.date.issued2023-04-
dc.identifier.urihttps://elibrary.tucl.edu.np/handle/123456789/18638-
dc.descriptionA dam is a structure or barrier built across a river, stream, or other body of water to restrict and then regulate the passage of water. So, stopping the passage of water and forming a reservoir constitute a barrieren_US
dc.description.abstractThe proposed Naumure Multipurpose project is located near Bhalubang of western Nepal. The project's benefits include hydropower production, irrigation, flood control and navigation. The proposed dam height of the Naumure reservoir is 165 m. Sedimentation deposition in reservoirs leads to the loss of the capacity of reservoirs, damaging the reservoirs and dam infrastructures thus, by sediment analysis such problems can be mitigated by making the policy. Therefore, this study aims to assess the sustainability of the Naumure multipurpose project with respect to the probable sedimentation in it. HEC-RAS 1D is used as the numerical modelling tool for the simulation of sediment transport. Rating curve calculator using HEC-RAS is used for obtaining sediment rating curve at Chernata station and Bagasotigaon station. The submergence is extended in the main and two tributaries, so sufficient length i.e. 2.21 km for main West Rapti, 25.46 km and 18.58 km for Mari and Jhimruk River respectively from Confluence point with Main West Rapti are considered for modelling. The Correlation coefficient obtained using observed and simulated sediment load at Bagasotigaon station for calibration of the model for three years (1985-1988) is 65.1% and the correlation coefficient using computed and simulated sediment load for Validation of model at Bagasotigaon station for three years (1990-1993) is 86.27%. Delta propagation deposition pattern is seen in the reservoirs. The percentage loss in the storage of Naumure reservoir for 10, 20, 30, 40 and 50 years are 0.61%, 1.46%, 2.39%, 3.37% and 7.4% respectively. The most influential and important five parameters: computational increment, transport function, maximum scour depth, sorting method and fall velocity method are selected for the sensitivity analysis. Among this transport function is the most sensitive parameteren_US
dc.language.isoenen_US
dc.publisherIOE Pulchowk Campusen_US
dc.subjectHEC-RAS 1Den_US
dc.titleSEDIMENT DEPOSITION ANALYSIS OF NAUMURE RESERVOIRen_US
dc.typeReporten_US
local.institute.titleInstitute of Engineeringen_US
local.academic.levelBacheloren_US
local.affiliatedinstitute.titlePulchowk Campusen_US
Appears in Collections:Civil Engineering

Files in This Item:
File Description SizeFormat 
Nabin Bhatt et al. be civil project report apr2023.pdf3.08 MBAdobe PDFView/Open


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.