Please use this identifier to cite or link to this item: https://elibrary.tucl.edu.np/handle/123456789/20952
Full metadata record
DC FieldValueLanguage
dc.contributor.authorThakur, Baibhav Kumar-
dc.date.accessioned2023-12-13T09:46:24Z-
dc.date.available2023-12-13T09:46:24Z-
dc.date.issued2023-11-
dc.identifier.urihttps://elibrary.tucl.edu.np/handle/123456789/20952-
dc.descriptionThe findings give insight into the solar power plant's long-term performance in Nepal’s Terai area under real working circumstances. The need for regular maintenance against array capture loss, making the grid more reliable, dusting off the Panels regularly is highlighted to maximize energy generation and export to the grid. Additional supplement research studies are also recommendeden_US
dc.description.abstractThe rapid growth in Utility Scale Solar Plants all around the world is acting like an Indicator of the rapid growth the Renewable Energy Sector has achieved in the last decade. Along with the number of benefits it has to offer, the growing Solar Power Generation sector comes along with several challenges. Despite the Design, Procurement, Installation and Commissioning of these Plants are much easier and convenient than the Hydropower Plants and the irradiance levels through-out the country is quite optimum for the Solar Power Generation, still there are many concerns and questions to the further growth of this Utility Scale Solar Power Generation Sector due to the factors, like: Power Generation hours limited to day, gradual degradation in efficiency of Solar Panels, requirement of huge land area, much variation in Power generation due to changing weather, shading, dust on panels etc. The current study conducts the Performance Analysis of two Utility Scale Solar Plants of Same Installed Capacity, 1.2096 MW in two different locations of the country to understand how Certain Parameters: Weather, Location, Design of the Plants, Wind Speed effect on the Power Generation from the Panels. 1.2096 MW each Solar Plants of Dhalkebar and Simara have been taken under the Study. The data of Power Generation for a period of 1 year (1st July, 2022 to 30th June, 2023) from these plants were collected to generate the idea of the actual Performance of each of these plants, which was further compared with the Outputs of Simulation done by using PVsyst 7.4.4. The annual S.Y., C.U.F.en_US
dc.language.isoenen_US
dc.publisherI.O.E. Pulchowk Campusen_US
dc.subjectSolar Plants,en_US
dc.subjectUtility Scaleen_US
dc.titlePerformance Analysis of two same capacity Utility Scale Solar Plants in Nepalen_US
dc.typeThesisen_US
local.institute.titleInstitute of Engineeringen_US
local.academic.levelMastersen_US
local.affiliatedinstitute.titlePulchowk Campusen_US
Appears in Collections:Mechanical and Aerospace Engineering

Files in This Item:
File Description SizeFormat 
Baibhav Kumar Thakur Master thesis mechanical and aero renewable energy Nov 2023.pdf2.61 MBAdobe PDFView/Open


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.