Title: ELECTRICAL ENERGY AUDITING AND ENHANCEMENT OF POWER SYSTEM AT BASBARI WATER TREATMENT PLANT, KATHMANDU
Authors: Dhakal, Dipesh
Keywords: water;Energy;Electrical
Issue Date: Apr-2023
Publisher: I.O.E. Pulchowk Campus
Institute Name: Institute of Engineering
Level: Masters
Abstract: The water treatment plant (WTP) employs a variety of electrical machines and utilities, making it an intensive energy consumption plant. In this study, an energy audit was conducted on the Basbari WTP in Kathmandu, Nepal to identify the hotspots that consume most of the energy in the plant and recommend solutions for energy-efficient operation. A power quality analyzer was used to analyze the energy consumption patterns of electrical parameters and data from the electricity authority. The study found that transmission pumps and backwash/makeup pumps consume 77% and 6% of the energy, respectively. Efficient utilization of pump motors could result in an annual cost savings of NRS 109,681.12 from transmission pumps, backwash pumps, and make pumps. The payback period for light replacement and installation of a capacitor bank is 2.16 years and 1.95 years, respectively.
Description: The history of piped water supply systems in Nepal dates back to 1895 A.D., when Bir Sumsher commissioned the first Bir Dhara system in Kathmandu, which was a type of water distribution network.
URI: https://elibrary.tucl.edu.np/handle/123456789/18015
Appears in Collections:Mechanical and Aerospace Engineering

Files in This Item:
File Description SizeFormat 
075MSESP006 Final Thesis Report.pdf2.78 MBAdobe PDFView/Open


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.