Please use this identifier to cite or link to this item: https://elibrary.tucl.edu.np/handle/123456789/18430
Full metadata record
DC FieldValueLanguage
dc.contributor.authorSapkota, Sobit-
dc.contributor.authorSubedi, Subarna-
dc.contributor.authorDahal, Utsav-
dc.date.accessioned2023-07-05T06:00:51Z-
dc.date.available2023-07-05T06:00:51Z-
dc.date.issued2023-03-
dc.identifier.urihttps://elibrary.tucl.edu.np/handle/123456789/18430-
dc.descriptionAs energy has been an important commodity requiring in almost every field. As accessible energy has quantitative constraints, efficient energy use has become critical. A major principle of utility-sector energy efficiency programs is that the energy they conserve reduces and balances the energy that would otherwise be delivered by the electricity grid or the natural gas infrastructure(Schumacher & Sathaye, 1999). Such saved kWh (electricity) or thermals (natural gas) are viable system resources because energy savings from customer programs can lower system demand enough to prevent the need for new supply infrastructure, such as generation plants, transmission lines, and distribution system upgradesen_US
dc.description.abstractThis study is aimed at examining the energy efficiency, energy intensity, environmental emissions reduction potential and energy security scenario of Hetauda Cement Industry Limited (HCIL) in Nepal. The research is being conducted with the objective of studying an existing benchmark for the energy intensity of the cement industry in Nepal and to examine the energy security risks for the limestone-based cement industries relying on imported energy. A study of the energy efficiency of the HCIL identifies that for the past five years specific power consumption has gradually increased from 223 kWh per ton to 295 kWh per ton of cement. The capacity utilization of the plant was below 50%. The plant's continuous operation over the last 36 years has reduced the efficiency of various plant equipment, increased breakdown time, increased production costs, and increased other indirect losses. Study suggests ways to optimize energy usage and reduce costs with lighting improvement with payback period of around 2 years, a gravel bed filter installation to emission control with payback of 3 years and waste heat recovery unit of 1.2 MW electricity capacity with payback of 14 yearsen_US
dc.language.isoenen_US
dc.publisherIOE Pulchowk Campusen_US
dc.subjectHCILen_US
dc.titleA STUDY ON ENERGY EFFICIENCY, ENVIRONMENTAL EMISSIONS AND ENERGY SECURITY OF LIMESTONE BASED CEMENT INDUSTRIES IN NEPAL: CASE STUDY OF HETAUDA CEMENT INDUSTRY LIMITED(HCIL)en_US
dc.typeReporten_US
local.institute.titleInstitute of Engineeringen_US
local.academic.levelBacheloren_US
local.affiliatedinstitute.titlePulchowk Campusen_US
Appears in Collections:Mechanical and Aerospace Engineering

Files in This Item:
File Description SizeFormat 
Sobit sapkota et al proj repo mech 2023.pdf4.27 MBAdobe PDFView/Open


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.