RELIABILITY AND AVAILABILITY EVALUATION OF PEAKING RUN-OF-RIVER (PROR) HYDROPOWER PLANT OWNED BY NEA

dc.contributor.advisorGautam, Basanta K.
dc.contributor.authorSilwal, Bipin
dc.date.accessioned2025-05-02T06:09:23Z
dc.date.available2025-05-02T06:09:23Z
dc.date.issued2025-04
dc.identifier.urihttps://hdl.handle.net/20.500.14540/24957
dc.language.isoen
dc.publisherI.O.E
dc.subjectMean Time Between Failures (MTBF)
dc.subjectMean Time to Repair (MTTR)
dc.subjectrepair rates (μ)
dc.titleRELIABILITY AND AVAILABILITY EVALUATION OF PEAKING RUN-OF-RIVER (PROR) HYDROPOWER PLANT OWNED BY NEA
dc.typeThesis
local.academic.levelMasters
local.institute.titleInstitute of Engineering

Files

Original bundle

Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
Master thesis Bipin Silwal electrical eng power electronics and drives apr 2025.pdf
Size:
5.05 MB
Format:
Adobe Portable Document Format

License bundle

Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
license.txt
Size:
1.71 KB
Format:
Item-specific license agreed upon to submission
Description: