Impact Analysis of Marsyangdi Corridor 220kV Transmission Line on the Operation of Integrated Nepal Power System
dc.contributor.advisor | Bhattarai,Nawraj | |
dc.contributor.author | Sapkota, Gaurav | |
dc.date.accessioned | 2025-04-13T06:48:43Z | |
dc.date.available | 2025-04-13T06:48:43Z | |
dc.date.issued | 2025 | |
dc.description | Hydropower development in Nepal started during the early 1900s with the establishment of Shree Chandra Hydro-Electric Power Station, now known as 'Pharping Hydropower Plant'. Despite being one of the early adopters of hydropower energy, Nepal was not able to make huge strides in this sector. The high investment cost required meant that Government alone could not develop these power plants | |
dc.identifier.uri | https://hdl.handle.net/20.500.14540/24752 | |
dc.language.iso | en | |
dc.publisher | Pulchowk Campus | |
dc.title | Impact Analysis of Marsyangdi Corridor 220kV Transmission Line on the Operation of Integrated Nepal Power System | |
dc.type | Thesis | |
local.academic.level | Masters | |
local.institute.title | Institute of Engineering |
Files
Original bundle
1 - 1 of 1
Loading...
- Name:
- Master Thesis Gaurav Sapkota Energy system planning and management Mechanical and aero space April 2025.pdf
- Size:
- 3.25 MB
- Format:
- Adobe Portable Document Format
License bundle
1 - 1 of 1
No Thumbnail Available
- Name:
- license.txt
- Size:
- 1.71 KB
- Format:
- Item-specific license agreed upon to submission
- Description: