Impact Analysis of Marsyangdi Corridor 220kV Transmission Line on the Operation of Integrated Nepal Power System

dc.contributor.advisorBhattarai,Nawraj
dc.contributor.authorSapkota, Gaurav
dc.date.accessioned2025-04-13T06:48:43Z
dc.date.available2025-04-13T06:48:43Z
dc.date.issued2025
dc.descriptionHydropower development in Nepal started during the early 1900s with the establishment of Shree Chandra Hydro-Electric Power Station, now known as 'Pharping Hydropower Plant'. Despite being one of the early adopters of hydropower energy, Nepal was not able to make huge strides in this sector. The high investment cost required meant that Government alone could not develop these power plants
dc.identifier.urihttps://hdl.handle.net/20.500.14540/24752
dc.language.isoen
dc.publisherPulchowk Campus
dc.titleImpact Analysis of Marsyangdi Corridor 220kV Transmission Line on the Operation of Integrated Nepal Power System
dc.typeThesis
local.academic.levelMasters
local.institute.titleInstitute of Engineering
Files
Original bundle
Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
Master Thesis Gaurav Sapkota Energy system planning and management Mechanical and aero space April 2025.pdf
Size:
3.25 MB
Format:
Adobe Portable Document Format
License bundle
Now showing 1 - 1 of 1
No Thumbnail Available
Name:
license.txt
Size:
1.71 KB
Format:
Item-specific license agreed upon to submission
Description: