Study of Impact of NewButwal-Gorakhpur 400 kV Transmission Line on The Operation and Reliability of Integrated Nepal Power System

dc.contributor.authorYadav, Gopal Kumar
dc.date.accessioned2023-12-20T05:34:03Z
dc.date.available2023-12-20T05:34:03Z
dc.date.issued2023-12
dc.descriptionIn recent years, the significance and imperative of conducting impact studies on grid reliability evaluation have escalated. This thesis represents load flow analysis with a focus on improving resilience and efficiency after adding New Butwal-Gorakhpur 400KV cross border transmission line to existing power system of Nepal and simulation of 2028A.D. INPS network to find the reliability indices.en_US
dc.description.abstractIn recent years, the significance and imperative of conducting impact studies on grid reliability evaluation have escalated. This thesis represents load flow analysis with a focus on improving resilience and efficiency after adding New Butwal-Gorakhpur 400KV cross border transmission line to existing power system of Nepal and simulation of 2028A.D. INPS network to find the reliability indices. The INPS is facing unprecedented challenges brought about by the increasing demand for electricity, the integration of hydropower and renewable sources, and the need for enhanced system reliability. This thesis reviews the current state of power systems and the challenges they face, including capacity constraints, energy losses. In this context, the integration of NB-G 400KV transmission line has emerged as a promising solution to address these challenges. The core of this research are used to assess the potential benefits, such as increased grid capacity, reduced transmission losses, improved power quality and reliability of the system after the integration of New Butwal-Gorakhpur (NB-G) line. Load flow analysis is carried out in DIgSILENT to find out system loss, voltage profile and reliability indicesen_US
dc.identifier.urihttps://hdl.handle.net/20.500.14540/21057
dc.language.isoenen_US
dc.publisherI.O.E. Pulchowk Campusen_US
dc.subjectCross Border Transmission line,en_US
dc.subjectNB-G 400kV,en_US
dc.subjectLoad flowen_US
dc.titleStudy of Impact of NewButwal-Gorakhpur 400 kV Transmission Line on The Operation and Reliability of Integrated Nepal Power Systemen_US
dc.typeThesisen_US
local.academic.levelMastersen_US
local.affiliatedinstitute.titlePulchowk Campusen_US
local.institute.titleInstitute of Engineeringen_US

Files

Original bundle

Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
Gopal Kumar Yadav Master thesis electrical engineering power system Dec 2023.pdf
Size:
8.56 MB
Format:
Adobe Portable Document Format
Description:

License bundle

Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
license.txt
Size:
1.71 KB
Format:
Item-specific license agreed upon to submission
Description: