Performance Analysis of Roof-top Grid Tied Solar PV Power Plant: “A Case Study of 100kWp Solar PV Power Plant at Nepal Telecom, Chhauni”

dc.contributor.authorSuwal, Ramesh
dc.date.accessioned2023-07-03T10:55:31Z
dc.date.available2023-07-03T10:55:31Z
dc.date.issued2023-04
dc.descriptionThe performance analysis for 100kWp grid-tied solar PV power plant installed at Chhauni Complex, Nepal Telecom, Kathmandu was performed.en_US
dc.description.abstractThe performance analysis for 100kWp grid-tied solar PV power plant installed at Chhauni Complex, Nepal Telecom, Kathmandu was performed. The technical and economic performance parameters were calculated from the data collected in the data logger of the inverters. The simulations of the system for installed capacity with three different scenarios were done in the PVsyst tool. The irradiance data obtained from the Department of Hydrology and Meteorology was used for simulation. The technical performance parameters for all the cases of simulations were compared. The economic analysis comparison between best scenario and actual case was done. The technical performance parameters like Energy generation, Final yield, Reference yield, Performance ratio, capacity utilization factor, overall system efficiency for the actual case were found to be 9.75MWh/month or 325kWh/day, 3.2kWh/kW/day, 4.5kWh/m2/day, 72%, 13.4%, 13.6% respectively. The system saves the energy bill to the owner of plant annually by NRs. 1.3 million. The economic performance parameters like NPV, IRR, LCOE and DPBP were found to be NRs.3.39 million, 17%, NRs. 7.92/kWh and 8.2 years respectively. Thus, the roof-top grid-tied solar PV power plant can be better for utility energy bill saving, own energy generation planten_US
dc.identifier.urihttps://hdl.handle.net/20.500.14540/18370
dc.language.isoenen_US
dc.publisherI.O.E. Pulchowk Campusen_US
dc.subjectRoof-topen_US
dc.subjectSolaren_US
dc.subjectPower Planten_US
dc.titlePerformance Analysis of Roof-top Grid Tied Solar PV Power Plant: “A Case Study of 100kWp Solar PV Power Plant at Nepal Telecom, Chhauni”en_US
dc.typeThesisen_US
local.academic.levelMastersen_US
local.affiliatedinstitute.titlePulchowk Campusen_US
local.institute.titleInstitute of Engineeringen_US
Files
Original bundle
Now showing 1 - 1 of 1
No Thumbnail Available
Name:
final print.pdf
Size:
2.75 MB
Format:
Adobe Portable Document Format
Description:
License bundle
Now showing 1 - 1 of 1
No Thumbnail Available
Name:
license.txt
Size:
1.71 KB
Format:
Item-specific license agreed upon to submission
Description: