“Future Energy Mix of Nepalese grid and its effect on Power System”

dc.contributor.authorLamichhane, Bharat
dc.date.accessioned2023-08-02T10:28:54Z
dc.date.available2023-08-02T10:28:54Z
dc.date.issued2023-06
dc.descriptionEnergy mix refers to the combination of different sources in to the grid to increase the power system reliability. In Nepal most of electricity is from hydro power plant. There are other alternative sources of energy to produce an electricity but hydro is much more available resources to produce electricity. There are different types of schemes of hydro power plants which can be operated to meet base load, intermittent load and peak load.en_US
dc.description.abstractEnergy mix refers to the combination of different sources in to the grid to increase the power system reliability. In Nepal most of electricity is from hydro power plant. There are other alternative sources of energy to produce an electricity but hydro is much more available resources to produce electricity. There are different types of schemes of hydro power plants which can be operated to meet base load, intermittent load and peak load. In current situation, there is some deficit of energy. So country is importing energy from India via different points. The generation pattern of hydro power plant is highly dependent in natural phenomenon of rain and hence the flow of water in river. In wet season the generation from run off river hydro power plants is high but in dry season the generation is low. Due to this there is large unbalance may arise in the system. The energy surplus deficit analysis will give an overview of future energy situation in advance which will be very helpful for energy planner to take necessary decision. Energy surplus analysis for fiscal year 2087/088 and for fiscal year 2092/093 under three scenario viz: under 4.5 % with only half of all generation license issued RoR/ PRoR projects in operation within fiscal year 2087/088 and half of generation license applied projects(RoR/PRoR) comes in operation till fiscal year 2092/093 (Scenario 1); under 4.5 % Economic growth rate with all generation license issued projects in operation within fiscal year 2087/088 and all generation license issued and generation license applied projects comes in operation till fiscal year 2092/093 (scenario 2) and under 7.2 % Economic growth with all generation license issued projects in operation within fiscal year 2087/088 and all generation license issued and generation license applied projects comes in operation till fiscal year 2092/093.en_US
dc.identifier.urihttps://hdl.handle.net/20.500.14540/18890
dc.language.isoenen_US
dc.publisherI.O.E. Pulchowk Campusen_US
dc.subjectEnergy,en_US
dc.subjectPower System,en_US
dc.subjectelectricityen_US
dc.title“Future Energy Mix of Nepalese grid and its effect on Power System”en_US
dc.typeReporten_US
local.academic.levelMastersen_US
local.affiliatedinstitute.titlePulchowk Campusen_US
local.institute.titleInstitute of Engineeringen_US
Files
Original bundle
Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
Bharat Lamichhane master thesis power system electrical june 2023.pdf
Size:
5.48 MB
Format:
Adobe Portable Document Format
Description:
License bundle
Now showing 1 - 1 of 1
No Thumbnail Available
Name:
license.txt
Size:
1.71 KB
Format:
Item-specific license agreed upon to submission
Description: