A study on financial assement of Hydropower project ( with reference to lower Modi 1 Hydropower project 10 MW
| dc.contributor.advisor | Kamal Deep Dhakal | |
| dc.contributor.author | Gurung, Naveen | |
| dc.date.accessioned | 2026-05-21T07:39:58Z | |
| dc.date.available | 2026-05-21T07:39:58Z | |
| dc.date.issued | 2013 | |
| dc.description.abstract | Not available | |
| dc.identifier.uri | https://hdl.handle.net/20.500.14540/26795 | |
| dc.language.iso | en_US | |
| dc.subject | Hydropower project | |
| dc.subject | Economic growth | |
| dc.title | A study on financial assement of Hydropower project ( with reference to lower Modi 1 Hydropower project 10 MW | |
| dc.type | Thesis | |
| local.academic.level | Masters | |
| local.institute.title | Shankerdev Campus, Putalisadak |
